After years of planning, in 2014 the municipality of Celerina decided to retain the existing junction with the cantonal road and not to proceed with the roundabout option. This meant that several structural engineering works had to be repaired. Fanzun AG was able to plan and oversee several refurbishment projects over a three-year period.
By using high-pressure water jetting to remove damaged concrete and carrying out appropriate reprofiling, the structures could be restored not only visually but also durably. At the same time, this made it possible to carry out structurally necessary reinforcements in certain areas.
During the works, a total of two frame bridges, one pedestrian underpass, one retaining-wall bridge, two bridge piers and four stream culverts were refurbished over a period of three years. This work generally had to be carried out under live traffic at all times. A carefully planned staging of the works was therefore essential.
Developer: Tiefbauamt GraubündenCompletion: 2017Project type: RepairsProject author: Fanzun AGConstruction costs: CHF 1.7 MilScope of services: Project Management, Civil Engineering
Download opens in new window - please do not close and wait until the PDF has been generated.
Dies kann etwas dauern.