Username
Password
Remember Me
What can you achieve in three months? In the case of the Cresta Palace, a great deal. For example, you can bring an entire hotel up to date, converting and renovating it. You might think it an incredible feat for the construction industry. But a closer look at the history of the Cresta Palace quickly shows that the hotel has often been a plaything of time, and has always known how to outwit the ticking clock.
As early as 1906, the Cresta Palace in Celerina raced against time. Only 13 months passed between the building permit and the opening of the grand hotel. At that time, the newly built hotel could accommodate 100 guests. It soon became clear that this was not enough, as demand for holidays in the healthy Alpine air of the Engadin kept growing. Just six years later, the hotel was extended with another wing with a hundred beds.
A successful future lay ahead of the grand hotel, until the First World War broke out. For five years, the hotel housed the Swiss military instead of travellers from all over the world.
Yet the war years did not hold back the hotel’s rise. The 1920s were THE era of grand hotels, and so they were also the golden years of the Cresta Palace.
Then came the Second World War. The hotel closed for seven years because nobody felt like travelling and guests stayed away. But even this difficult time could not break the grand hotel. In 1956, it celebrated its 50th anniversary. The list of regular guests kept growing, and they wanted more. A year later, guests in the Engadin were drawn to the mountains. The first cable car in Celerina was a pioneer of the mountain railways in the Upper Engadin and made the hotel nearby even more attractive.
The hotel always kept a good eye on its guests’ needs. Just ten years later, a swimming pool was added, and twenty years after that, all rooms were fitted with their own bathrooms.
In the 1990s, the kitchen was brought up to date, and in the 2000s the wellness area opened. Guests’ wishes were once again fully met.
This time, however, it became clear that it was time to pay tribute to the hotel’s ambience as well, and to bring the venerable rooms into the modern age.
Fanzun was commissioned to develop the overall concept for modernising the Cresta Palace. The concept includes converting 40 rooms, including five suites and seven junior suites. It also covers the complete renovation of the west wing and the refurbishment of a hundred more hotel rooms, as well as bringing the hotel up to current fire safety regulations and accessibility standards. The only catch? All of this had to be done in just three months.
In its past, the Cresta Palace has faced both wonderful and difficult times. The good, historic times should remain visible in the hotel’s rooms in future. However, various interventions, conversions and extensions had dimmed the grandeur of the 1920s a little. The modernisation aims to restore a common thread through the old walls, so that the hotel is once again seen as one large, unified whole.
The current conversion should not only revive the charm of the original building but also meet guests’ higher expectations and today’s building requirements. The wonderful park that adorns the driveway will regain its expressiveness. Regional landscaping and a central fountain will tempt guests to linger from the moment they arrive. Inside, the stylish, typical grand hotel staircase moves back into the centre. It once again serves as a prominent link between the public rooms and the guest room wings.
In contrast to the staircase, the rooms originally had a restrained, neutral character. Later renovations subjected the rooms to various fashions, and the coherent whole was lost.
To bring the historic basic structures back to life, it is essential to remove bathrooms that were added later and restore the original layout. Simpler bathrooms allow the original grandeur of the rooms in the west wing to return, and guests regain the original sense of spaciousness.
The colour concept in the rooms takes up the floral variety of earlier times. It varies from yellow on the ground floor to red on the first floor, green on the third floor and blue on the fourth floor. In the bathrooms, the colour concept of each room floor continues, with decorative ornamental tiles setting fitting accents. For the furnishings and textiles, fabrics and patterns appropriate to the original period were chosen. They create a harmonious ambience without being intrusive.
To ensure completion on schedule, the team had to perform. At peak times, 130 people were on site. In some cases, several contractors were engaged for the same type of work to make up for missing capacity and speed up progress. Fanzun was also present with double the usual strength: two construction managers kept an eye on things, so the clients’ quality standards were always met.
Even here, time tried to upset the Cresta Palace’s big plans, or rather, current world events did. Material deliveries were interrupted, delayed or even cancelled worldwide. This naturally affected deliveries to the Engadin too, including deliveries intended for the Cresta Palace. But through persistence, flexibility and a little luck, the impossible was made possible. After three months, the finished Cresta Palace was handed over to a satisfied client.
Once again, the Cresta Palace stood up to its relentless opponent. As in the past, the Palace recognised its guests’ needs and delivered fitting solutions.
But time does not stand still. It will be exciting to see what challenges, and above all what opportunities, it brings to the Cresta Palace.
Architects Engineers Consultants: Our teams in Chur, Zurich and Engadin are made up of more than just experts who have mastered their respective fields. Above all, they are people with a feel for the bigger picture, who think ahead and always keep an overview. With more than 140 architects, engineers and consultants, our strength lies in thinking and acting across disciplines and holistically. Whether in hospitality and tourism, industry and commerce, infrastructure or residential construction – we are the general planner who always works to ensure that you, as our client, get exactly the result you want, one that reflects your vision.
Fanzun AG – Architects Engineers Consultants
Communications
Salvatorenstrasse 66
7000 Chur
Telephone +41 58 312 88 28
kommunikation@fanzun.swiss