In the context of renovating and extending the historic 100+ year-old Alpine hotel in Muottas Muragl, ways and means were sought to provide sustainable and CO2-neutral energy for the building. The task involved exploring various power generation sources such as wind energy, biomass, solar and photovoltaic energy.
The funicular railway ascends a vertical height of 700 m to 2‘456 m above sea level. Photovoltaic panels were installed along the topmost track section. Due to local geographic conditions, the location is ideally suited to generate photovoltaic power. The annual energy yield is 50% higher than in comparable installations at lower levels.
The installation site along the railway track is challenging due to wind and snow conditions as well as safety requirements of the railway but it offered an opportunity to realise a sufficiently large solar array in a landscape-compatible manner beyond the snowline.
Developer: Current AG, ZürichCompletion: 2010Project type: New structureProject author: Fanzun AGConstruction costs: CHF 0,5 MilScope of services: Cost Planning, Bids & Tenders, Construction Supervision, Cost Control, Scheduling, Quality Assurance, Commissioning, General Planning, Development, Civil Engineering, Energy, Guidance, Overall Supervision
Download opens in new window - please do not close and wait until the PDF has been generated.
Dies kann etwas dauern.