Benutzername
Passwort
Angemeldet bleiben
IBW Chur, which runs a forest and wood training centre in Maienfeld, initiated a Swiss-Italian pilot project with partners to set up a wood industry training centre. Plans envisaged building a wood technology centre in Poschiavo which would attract Swiss and Italian professionals.
In order to retain the façade as a remnant from the age of industrialisation, the building was insulated from the inside. The windows were carefully restored and fitted with insulating panes. The building was repurposed only by adding furniture without changing its structure to underscore the hall’s old charm.
The newly founded company CTL SA acquired the former serpentine stone workshop adjacent to the railway station. The existing industrial building made of RC and brick from the early 20th century had impressive architectonic qualities and was worth conserving.
Bauherr: Centro tecnologico del legno SA, PoschiavoFertigstellung: 2015Projektart: Gesamterneuerung, RestorationProjektverfasser: Fanzun AGBaukosten: CHF 2,5 MioLeistungsumfang: Führung, Gesamtleitung, Projektsteuerung, Baumanagement, Kostenplanung, Offertwesen, Bauleitung, Kostenkontrolle, Terminplanung, Qualitätssicherung, Inbetriebnahme, Generalplanung, Arealentwicklung, Energie, Akustik, Bauphysik, Entwicklung, Machbarkeitsstudie, Gestaltung, Projektierung, Architektur, Innenarchitektur, Bauingenieurwesen, Strategie
Download öffnet in neuem Fenster - bitte nicht schließen und warten bis die PDF generiert wurde.
Dies kann etwas dauern.